Business unit

Energy development for a sustainable future

Tecnocap S.A. manages its own 142 km power transmission line and substations, supplying the Cerro Negro Norte mine and Aguas CAP desalination plant. It also allows the injection of solar energy from Amanecer Solar to the National Electric System (SEN, for its acronym in Spanish).

As part of its expansion in renewable energies, Tecnocap is developing two 200 MW solar farms in the Copiapó Valley, currently in the engineering phase, which will provide clean energy for future operations.

Sostenibilidad CAP

Tecnocap S.A. in figures

Linea electrica
142
km of transmission line in the Atacama region
electricidad
125
MW of installed capacity on its transmission line
Panel solar
2
solar farm projects in engineering phase

Operations map

Power transmission line, located in the Atacama Region, with a total length of 142 km, with two sections. The first of 66 km from the Cardones substation to the CNN substation, and a second section of 82 km from the CNN substation to the Totoralillo substation.

Property

99,9% of Tecnocap S.A. is owned by Grupo CAP